• Quality Management SystemTo build the best without compromising!
img

Gaziantep

Contractor company: B.ERGÜNLER YOL YAPI İNŞ. TAAH. MAD. NAK. SAN. VE TİC.A.Ş.
Employer: GAZİANTEP BÜYÜKŞEHİR BELEDİYESİ

GAZİANTEP INTERSECTION

The construction of bridge crossing by post-tensioning method which enables 88 mt distance in one drawing also includes the catenary tram system. The world record is 104 meter post-tensioning in total by dividing at 46 mt and it is 88 meters in our project as unique in Turkey. Within the scope of the intersection construction, there is a work of 3.140 meter bored piles with a diameter of Ø 120. Due to the occurrence of calcite cavities in the sub-base of the bridge, the project was completed and utilized with the injection hole of 15,747 mt with 2022 tons of cement.


Gallery


img

Ergunler Yol Yapı, which continues to grow by investing in technology and people for a sustainable future, will continue to be the name of trust and quality in the construction sector.

Contact Information

  • Konak Mah Merkez(120) Sk. Nilüfer Park Evleri Sit. G Blok Apt. No: 4 G/1
    Nilüfer - BURSA
  • info@ergunleryolyapi.com
  • +90 224 441 5034