Tüfekçikonak

HYDROELECTRIC POWER PLANT

About the Project Introduction of the Project
Name of the Project Tüfekçikonak HEPP Tüfekçikonak HEPP Project is located on an area where the land is apeak with an intense vegetation. Designed with relatively small water structures to be compatible with these characteristics of the topography, the plant has a significant production potential thanks to 362 mt drop. Therefore, it is possible to turbine with 2 horizontal Pelton type units at a volume peak of 10 thousand cubic meters which makes daily regulation possible.
Location of the Project İnegöl / Bursa
Type of Plant Tyrolean Type (4 Regulators)
Installed Power 5.40 MW
Total Energy 14.90 GWh
Drainage Area 23.54 km²
Gross Drop 362 m
Type of Turbine Horizontal Pelton

 


Gallery


img

Ergunler Yol Yapı, which continues to grow by investing in technology and people for a sustainable future, will continue to be the name of trust and quality in the construction sector.

Contact Information

  • Konak Mah Merkez(120) Sk. Nilüfer Park Evleri Sit. G Blok Apt. No: 4 G/1
    Nilüfer - BURSA
  • info@ergunleryolyapi.com
  • +90 224 441 5034