Bükor 2

HYDROELECTRIC POWER PLANT

About the Project Introduction of the Project
Name of the Project Bukor II Regulator and HEPP Bukor II Regulator and HEPP Project is located on the Sakarya River within the borders of Golpazari town of Bilecik. The project is the River type power plant and has three horizontal Kaplan turbines.
Location of the Project Golpazari / Bilecik
Type of Plant Hydroelectric (River Type)
Installed Power 13,05 MW
Total Energy 58.109 GWh/year
Drainage Area km²
Gross Drop m
Type of Turbine Horizontal Kaplan Bulb