Ankara - Sivas Railway
Infrastructure Supply Construction between Yerköy Yozgar Sivas (KEISM II - KM 332+3300 /363 527 /727 construction work)
Contractor Company: B.Ergünler Yol Yapı İnş. Taah. Mad. Nak. San. ve Tic. A.Ş.
Tender Date: 26.08.2013
Tender price: 263.021.967,40 ₺
Contract Date: 10.07.2014
Location Delivery Date: 25.07.2014
Consultant Company: BOTEK - MEGA Business Partnership
ANKARA SİVAS RAILWAY
- Ankara-Sivas Railway Project, Yerköy-Yozgat-Sivas (Km 332 +300 363 +527,727) Between the supply of infrastructure supply (section II) construction work.
- Applied Construction Technique: Project Start and Final Completion Date: 2015 - 2019 (Project Budget Estimation has been increased and 96 %of the work has been completed).
Type of Manufacturing | The Amount Of Exploration |
Unit |
---|---|---|
Route Excavation Manufacturing | 21.266.008 | m³ |
Route Filling Manufacturing | 21.266.008 | m³ |
Tunnel Manufacturing (Excavation-Support) | 21.266.008 | mt |
Tunnel Manufacturing (covering concrete) | 2.578 | mt |
Viaduct Manufacturing | 6 | piece |
Underpass Manufacturing | 11 | piece |
Overpass Manufacturing | 11 | piece |
Culvert Manufacturing | 52 | piece |
Forepoling in the tunnel (of 9 mt length and 3.5” diameter) | 154.78 | m |
Cast in Site Pile in Diameter of 165 cm | 628.82 | m |
Permanent Strut Manufacturing and Mounting | 12.76 | kg |